CommercialPublic worksSouthern California

REYSTONE OPERATING PRINCIPLE / 01

Every opening is a control point.

Commercial doors, hollow-metal frames, and finish hardware—furnished, installed, and closed out for general contractors, public agencies, and institutional facilities.

08
OPENING TYPEHOLLOW METAL / PAIR
LICENSECSLB B #1142540
SPECIALTYC-61 / D-28
CERTIFIEDDVBE · SDVOSB
PROCUREMENTSAM ACTIVE
PUBLIC WORKSDIR REGISTERED
SCROLL

Less Division 08 friction.More control in the field.

We coordinate the opening as a system—not as a stack of unrelated products arriving at different times.

01

SPECIFICATION CLARITY

Review before release

Door, frame, and hardware requirements are cross-checked against the drawings, schedule, and field conditions before material is ordered.

02

ONE ACCOUNTABLE SCOPE

One point of contact

Procurement, installation, and closeout are coordinated through one responsible point of contact, reducing handoffs between supplier and installer.

03

OPENING-LEVEL STAGING

Material ready by mark

Hardware is organized by opening so field crews spend less time sorting boxes and more time completing functional openings.

Doors, frames, and hardware.Coordinated end to end.

From plan review through procurement, installation, and closeout, Reystone builds the scope around the complete opening.

Representative hollow metal doors and finish hardware staged in a distribution warehouse PROCUREMENT + STAGING 01 / 03

PRIMARY SPECIALTY

Hollow metal doors & frames

Standard, custom, and labeled assemblies for commercial, institutional, and public-works environments. Material is coordinated from approved documents to the field opening.

  • Welded and knock-down frames
  • Single, pair, and communicating openings
  • Vision lites, louvers, and hardware prep
  • Fire-rated and labeled assemblies

Doors, frames, and hardware are coordinated by opening, reviewed upon receipt, and staged to project sequence through established manufacturer and distributor relationships.

Representative commercial hollow metal door with lever lockset and deadbolt in an institutional corridor HARDWARE + FIELD DETAIL 02 / 03
01

Architectural doors

Commercial wood and specialty door packages sourced to the approved schedule and coordinated with frames and hardware.

02

Finish hardware

Closers, hinges, locksets, exit devices, coordinators, thresholds, gasketing, and accessible operators organized by opening.

Electrified openings: power, cabling, programming, and integration coordinated with licensed electrical and security trades unless expressly included.
03

Fire-rated assemblies

Labeled components installed as complete assemblies with field verification of labels, clearances, fasteners, and operating condition.

04

Retrofit & opening surveys

Existing-condition surveys for renovations, tenant improvements, and replacement projects where dimensions and hardware conditions must be verified.

05

Preconstruction & coordination

Plan and specification review, takeoffs, schedule coordination, substitution review, procurement planning, and constructability feedback before release.

From specto sign-off.

Every opening follows the same controlled path—built to surface discrepancies early, protect procurement, and reduce field rework.

Start a bid review
  1. PHASE 01

    Spec review & takeoff

    Hardware schedules, architectural drawings, fire-rating requirements, and accessible-opening criteria are reviewed together.

  2. PHASE 02

    Coordination & submittals

    Conflicts, missing information, and product substitutions are flagged before release. Submittals are organized for efficient review.

  3. PHASE 03

    Procurement & staging

    Doors, frames, and hardware are tracked, received, and organized by opening or project phase before they reach the install area.

  4. PHASE 04

    Installation & field verification

    Alignment, operation, hardware function, and assembly details are checked as work progresses—not left until closeout.

  5. PHASE 05

    Documentation & closeout

    Opening records, warranties, keying information, and required closeout documents are assembled into a usable turnover package.

Verified. Documented.Ready for the bid list.

Core information procurement teams and prime contractors need before issuing an invitation.

LICENSING + REGISTRATION

01
CSLB License
General B · #1142540 · Active
Specialty
C-61 / D-28 · Doors, Gates & Activating Devices
DIR
Registered for California Public Works
SAM.gov
Active · UEI TSVEMGC755U7
NAICS
236220 · 238290 · 423390

CERTIFICATIONS + DOCUMENTATION

02
CA DVBE
Disabled Veteran Business Enterprise
SBA SDVOSB
VetCert verified
CA Small Business
SB-Micro + SB-PW
Bonding
CNA Surety · Up to $750K, subject to project review
Documentation
Available for qualified opportunities
CA DVBESBA SDVOSBCA SB-MICROCA SB-PWDIR REGISTEREDSAM ACTIVE
Capability statement

License, certification, insurance, and bonding documentation is available for qualified opportunities.

Representative hollow metal door with a narrow vision lite FM 00-RSC / OPERATING DOCTRINE

Built aroundcontrolled access.

Before Reystone was a construction company, the experience behind it was shaped in environments where access mattered—from U.S. embassies and checkpoints in Afghanistan to federal ports of entry.

In those environments, an entry point was never just a doorway. It was the controlled transition between public and protected space. Documentation, accountability, and attention to detail were part of mission success.

That same mindset is now built into Reystone. Every opening is a control point.

Founded by Marine Corps veteran Jose Alfonzo Reyes and backed by more than 50 years of combined construction experience, Reystone applies disciplined coordination, hands-on field knowledge, and supply-chain thinking to commercial openings across Southern California.

Jose Alfonzo Reyes, founder of Reystone Construction
Jose Alfonzo ReyesFounder · Marine Corps Veteran

Send usyour plans.

Pricing a door package, building a bid list, or looking for a certified Division 08 trade partner? Share the project information and Reystone will follow up.

CALL(213) 578-5303 EMAIL — BID INVITATIONSprocurement@reystoneconstruction.com
SERVICE AREAGreater Los Angeles + Southern California
RESPONSE TARGETTypically within one business day
PROJECT INTAKE / 01Required fields *

PDF or ZIP, maximum 8 MB. Use a plan-room link for full bid sets.

Bid invitations may also be emailed directly to procurement@reystoneconstruction.com.

By submitting, you authorize Reystone to review and respond to the project information provided. Privacy policy.