VETERAN-OWNED  ·  DVBE  ·  SDVOSB CERTIFIED

Division 08 Specialists. Doors. Frames. Hardware. Supply & Install.

Built by experience at controlled entry points. Access, documentation, and inspection were never optional.

Built for public works standards, inspection scrutiny, and compliance-driven projects.

CA General B #1142540 · DIR Registered · SAM.gov

Scroll

Registered. Certified. Inspection-Ready.

Federal
SDVOSB SAM Registered
State of California
DVBE SB(Micro) SB-PW DIR Registered
Local & Regional
LA Metro SBE

Our certifications help general contractors and prime contractors meet DVBE, SBE, and small business participation goals on federal, state, and local projects.

08

Every Opening Is a Control Point

Doors, frames, and hardware aren't finish work. They're where access is granted or denied, where fire-ratings are tested, where ADA compliance is measured to the inch. Every opening in a building is a decision point. The wrong call creates liability, not just a punch list. Reystone was built around that understanding.

Before this was a construction company, the experience behind it was shaped in environments where thresholds were never an afterthought. U.S. Embassy security perimeters. Military operations in Afghanistan. Federal enforcement at the nation's busiest ports of entry. Every role centered on the same discipline: verify access, document the process, maintain accountability at the point of control. That discipline now drives how we procure, install, and close out every project.

If material can't be traced, it isn't trusted. If it isn't documented, it isn't approved. If it isn't verified, it doesn't get installed.

Reystone Construction is a California-licensed General B contractor specializing in Division 08. Commercial doors, frames, hardware, and fire-rated assemblies across Southern California. We work with general contractors, property managers, and public agencies who need controlled, accountable execution on projects where failed inspections aren't absorbed. They're remembered. Tenant improvements in occupied buildings. Retail and restaurant buildouts on compressed timelines. Education and healthcare facilities where code compliance is audited, not assumed. One subcontractor for the full Division 08 scope: procurement, installation, documentation, and closeout.

Scope of Work/ Division 08

One trade. One scope. One point of accountability. Material supply through installation and closeout. Specified, sourced, staged, installed, documented.

01

Hollow Metal Doors & Frames / Supply & Install

Standard, custom, and fire-rated hollow metal assemblies. We source, procure, and install welded and knock-down frames to NFPA 80 and CBC requirements. Correct labels, correct fasteners, correct clearances. Material traced from manufacturer to opening. Documented and inspection-ready before your PM walks the site.

02

Wood & Architectural Doors / Supply & Install

Flush, stile-and-rail, and pre-finished commercial wood doors sourced and specified to architect intent. Installed plumb, gapped to code, hardware prep verified against the schedule before the door ships. The details that generate punch items when nobody checks. We check.

03

Finish Hardware / Supply, Stage & Install

Closers, hinges, locksets, panic devices, exit trim, door coordinators, and ADA operators. Every piece pre-labeled by opening number, staged in project-specific kits, matched to the approved hardware schedule. No field sorting. No missing parts. No schedule gaps from wrong shipments.

04

Fire-Rated Assemblies

Fire-rated doors, frames, and hardware installed as complete labeled assemblies. Correct labels, fasteners, clearances, gasketing. Documented as a full assembly for AHJ sign-off. Not individual components.

05

ADA & Accessibility Compliance

Threshold heights, opening force, maneuvering clearances, closer timing, automatic operator placement. Every entry installed to current ADA and CBC accessibility standards. Built to the numbers inspectors measure.

06

Door & Hardware Surveys

Existing-condition assessments for renovation, TI, and repositioning projects. We document what's in place, flag what's non-compliant, and deliver a defined scope for replacement. Your estimate is accurate before the bid goes out.

From Spec to Sign-Off

Every opening follows the same disciplined path. Specified, sourced, staged, installed, documented. Nothing skipped, nothing improvised, nothing left for punchout.

Phase 01

Spec Review & Takeoff

Hardware schedule cross-referenced against architectural drawings, fire-rating requirements, and ADA criteria. Discrepancies flagged before material is ordered.

Phase 02

Procurement & Traceability

Material sourced from authorized distributors with full chain-of-custody documentation. UL/WHI labels verified at purchase. Buy American compliance confirmed upstream.

Phase 03

Pre-Label & Stage

Hardware kitted and labeled by opening number. Frames sorted by phase and floor. Everything matched to the approved schedule before it leaves the staging area.

Phase 04

Install & Self-Inspect

Installed to spec with stage inspections at each opening. Clearances, operation, labeling, and gasketing verified before moving to the next unit. Not at closeout.

Phase 05

Documentation & Closeout

Signed inspection records, warranty letters, keying schedules, and as-built documentation delivered for AHJ review. Closeout package ready when the project ends.

Built for Specs, Submittals, and Scrutiny

One question behind everything we do: does this reduce risk on your project, or create it?

01
Inspection-Ready Before You Ask

We stage-inspect every opening before your PM walks it. Correct labels, correct hardware, correct clearances, correct operation. We don't fix problems at closeout. We eliminate them during installation.

02
Hardware Staged, Not Sorted On Site

Hardware arrives organized by opening number, matched to the approved schedule, in project-specific kits. Your carpenters don't sort it. Your PM doesn't chase missing parts. Staged to your phasing plan.

03
Material Supply Controlled Upstream

We source, procure, and supply all Division 08 material. Traced, documented, and verified before it ships. Not corrected after it arrives. Buy American documentation, fire-rated label verification, and lead-time tracking happen at procurement. Not at punchout.

04
Occupied-Building Discipline

Tenant improvements, active retail, healthcare corridors. Noise, dust, tenant access. Built into the scope from day one.

05
Compliance Documentation, Not Just Claims

ADA clearances, CBC fire-rating requirements, NFPA 80 inspection criteria, prevailing wage records, certified payroll. We produce the documentation, not just the work. Built to withstand submittals, inspections, and closeout review.

06
One Sub / Multiple Participation Credits

DVBE, SDVOSB, SBE, SB(Micro), SB-PW, LA Metro SBE. One Division 08 subcontract helps your bid meet participation requirements across federal, state, and local agencies.

NFPA 80

Fire Door Assemblies

Labeled assemblies installed and documented per current NFPA 80. Signed inspection records ready for AHJ review.

ADA / CBC

Accessibility Standards

Door force, maneuvering clearances, closer timing, threshold heights. Built to the numbers inspectors measure.

IBC / CBC

Building Code

Fire-rated assemblies, egress requirements, panic hardware, delayed egress. Code-aligned before your PM walks the site.

DIR / PW

Prevailing Wage

DIR-registered workforce. Certified payroll. Apprenticeship compliance. Documentation that holds up to audit.

10+
Years in the Trade
5
SoCal Counties Served
8
Active Certifications
3
NAICS Codes Registered

Markets We Serve

Division 08 shows up in every commercial building type. These are the markets where our compliance discipline and procurement control deliver the most value.

Tenant Improvements

Office buildouts, suite demising, co-working conversions. Occupied-building protocols, fast-turn schedules, code-compliant entries and corridors. Inspected and closed without return trips.

Retail & Restaurant

Storefront entries, back-of-house rated doors, ADA-compliant customer access. Coordinated around your opening timeline and finish trades. Hardware that passes health and fire inspection the first time.

Multifamily & Mixed-Use

Unit entry doors, corridor fire assemblies, common area hardware, ADA-compliant units. High unit counts with hardware staged by floor and phase. Consistent quality at volume.

Healthcare & Institutional

Rated corridor assemblies, labeled hardware, access control prep, privacy function sets. Documentation and inspection standards for licensed facilities where non-compliant openings stop occupancy.

Public Works & Government

Prevailing wage compliance. DIR-registered workforce. Buy American documentation. Certified payroll. DVBE and SBE participation credit. The documentation discipline that public owners and prime contractors require.

Education (K-12 & Higher Ed)

Classroom security hardware, rated corridor doors, ADA entries, DSA inspection-ready installations. Built to the standard the inspector checks.

Southern California/ Five Counties

SAN BERNARDINO RIVERSIDE LOS ANGELES ORANGE SAN DIEGO
  • Los Angeles County
  • Orange County
  • Riverside County
  • San Bernardino County
  • San Diego County

One call for Division 08 across Southern California.

Built to Prevent Inspection Issues Before They Happen

Pricing a Division 08 package. Building a bid list. Need a compliant sub for a compliance-driven project. Send us the plans.

Location

5800 S Eastern Ave Suite 500
Commerce, CA 90040